Industrial Operations Intelligence

Your plant generates signals.Kinetra turns them into context to run better.

Connect industrial data, manufacturing execution, performance and costs in one operational view, built to live alongside your ERP and your OT infrastructure.

Live plant

Factory Pulse

Conceptual simulation with synthetic data

Availability—
Not produced—

    Works alongside your ERP, SCADA, PLC, HMI and historian. It does not replace them. The devices on this page are illustrations and the data is simulated.

    Plant data exists. Context doesn't.

    1. Every system sees one piece

      PLCs, SCADA, HMIs, historians, sensors and spreadsheets store data in different formats, units and clocks.

    2. You know how long the stoppage lasted. Not what it cost.

      The lost time sits in a log. The impact on labor, energy, spare parts and unrealized production is rebuilt by hand.

    3. The ERP plans. The floor runs something else.

      Orders live in the ERP, while quantities, consumption and shifts are captured separately, and late.

    4. A defect means investigating by hand

      Linking order, material, lot, equipment and quality takes hours when there is no genealogy.

    5. If the network fails, visibility goes dark

      Without local resilience, a lost connection leaves gaps in the data and decisions made blind.

    Each layer does its job. Kinetra connects the middle.

    The ERP defines business intent. Kinetra manages industrial execution. The PLC controls the physical process. Select a layer to see what belongs to it.

    What it owns
    With Kinetra
    Limit
    Experience
    Role-based interface for management, operations, quality, maintenance and OT.
    Core
    Orders, execution, OEE, quality, traceability, stoppages and costs.
    Connect
    Canonical adapters to the ERP, CMMS and other enterprise systems.
    Edge
    Industrial connectors, normalization, local resilience and a command gate.
    Studio
    Plant modeling, tag mapping, recipes and change governance.
    Intelligence
    Time series, events, indicators and operational analytics.
    Routes forbidden by designUI → PLCERP → PLCAI → PLC

    IT/OT connectivity

    Connect the plant without exposing the PLC.

    Kinetra Edge prefers to reuse what already exists: your SCADA, your historian, your gateways. Touching the controller is the last resort. Pick a mode to see the data path.

    Kinetra Edge

    OT sources

    • PLC or controllerS7, EtherNet/IP, Modbus TCP, OPC UA
    • Meters and sensorsenergy, water, steam
    • Scales and printersserial or TCP/IP
    • SCADA, HMI or OPC serverOPC UA
    • Industrial historianexisting history
    • Broker MQTT / Sparkplug BUnified Namespace

    Kinetra Edge

    Industrial Connectivity Fabric

    • Connectors with declared capabilities
    • Physical address → canonical tag
    • Quality and freshness of every signal
    • Store-and-forward by priority
    • Connection budget and adaptive reads
    • Read-only by default

    Kinetra and the business

    Kinetra Core

    Orders, execution, OEE, quality and costs

    ERP, CMMS and analyticsvia Kinetra Connect

    Conceptual architecture. Protocol families reflect the design scope; availability by version and vendor is confirmed in each plant's technical assessment.

    Preferred order for connecting an asset

    Less load on the controller, fewer new connections, less risk to operations.

    1. 1Existing OPC UA in the SCADA, HMI or gateway
    2. 2Existing industrial historian or gateway
    3. 3Existing MQTT or Sparkplug
    4. 4OPC UA directly on the controller
    5. 5Native PLC driver
    6. 6Gateway for legacy or serial systems
    7. 7Custom connector, as a last resort

    One signal, with its quality in plain sight

    The Core doesn't know memory addresses. It knows canonical tags with unit, quality and timestamp.

    DB42.DBD18equipment.rm01.production.speed
    Canonical tagValueQualityAge

    Synthetic values. Quality follows the measurement model: GOOD, UNCERTAIN, BAD and UNKNOWN.

    Cost & Loss Intelligence

    Every stoppage has a cause. And a cost.

    A stoppage starts several economic clocks at once. Kinetra calculates them with configurable rates, real consumption and the duration of each machine state. Move the controls and watch the result change.

    Event type

    Example rates, configurable per customer. This is not data from a real plant.

    Event duration
      Opportunity estimateUnrealized contribution
      US$ 0

      Direct costs—Real consumption and resources
      Imputed costs—Rates and provisions
      Estimated opportunity—Not added to costs

      Direct costs, imputed costs and opportunity are shown separately. Composition rules prevent counting the same cost twice, for example maintenance labor as idle labor.

      Cost matrix by machine state
      StateFixed assetLaborEnergyUtilitiesMaintenanceLost production
      RUNNINGYesYesActualActual——
      IDLEYesYes / policyStandbyStandby—Optional
      SETUPYesYesActualActualOptionalOpportunity
      PLANNED_STOPYesPolicyStandbyStandbyOptionalPolicy
      UNPLANNED_STOPYesYesStandbyStandbyOptionalYes
      MAINTENANCEYesPolicyActual / standbyActualYesPolicy
      FAULTYesYesActual / standbyActualPossibleYes
      OFFLINEPolicyPolicyUnknown / estimatedPolicy—Policy

      The matrix is configurable per plant and per equipment class.

      Example rates used in this calculation
      ComponentExample rateBehavior
      Machine fixed chargeUS$ 47.30 / hFixed
      Operator, fully loadedUS$ 28.80 / h × 4 operatorsFixed
      Maintenance technicianUS$ 35.00 / h × 2 techniciansVariable
      ElectricityUS$ 0.184 / kWh (standby 38 kW, setup 85 kW)Variable
      Water and steamUS$ 6.20 / h when stopped, US$ 9.00 / h in setupVariable
      Spare parts and consumablesUS$ 180 per intervention of 15 min or morePer event
      Restart provisionUS$ 35 per start-upPer event

      Rates are versioned in rate cards. Changing a future rate does not change historical costs that are already consolidated.

      MES/MOM execution

      From the ERP order to confirmation, with traceability.

      Every order moves through explicit states. Every action is recorded with user, equipment, shift and correlation ID. Walk through the seven stages.

      9:41Execution

        What gets recorded

          Genealogy

          Investigate a defect without digging through files

          Every link stores equipment, operation, user, time, recipe and quality result. Pick the question and follow the chain.

          Synthetic identifiers and quantities.

            Production, OEE and energy

            Indicators with explanation and action.

            OEE breaks down into the losses that make it up. Energy is viewed per ton and per shift. Adjust the values to see how scheduled time is distributed.

            Break down OEE

            Compare shifts

            Synthetic data. The energy standard is an example value.

            The same plant, seen from every responsibility.

              Industrial security

              No click reaches the PLC without passing through the gate.

              Every command to a machine follows a route with policy, authorization, validity and audit. The controller keeps the last word. Try four scenarios.

                  Conceptual illustration of the approval step.
                  Read-only by default
                  Every industrial connection starts as READ_ONLY. Writing requires classification and approval.
                  Zones and conduits
                  Segmentation with default deny, aligned with IEC 62443 as a design goal.
                  Machine identity
                  X.509 certificates for Edge and connectors, with no secrets in repositories or containers.
                  Privileged access
                  Administrative MFA, just-in-time access and recorded sessions. No direct VPN to the PLC.
                  Signed software
                  Releases with SBOM and signature. Edge installs only verified packages, with rollback.
                  End-to-end audit
                  Every action leaves a correlation ID, from the ERP order to the confirmation.

                  Design controls and target architecture. This site does not claim certifications or audits; any compliance scope is validated per project.

                  What exists today and what is on the way.

                  In a technical assessment it is better to know from the start what can be seen working and what is architecture. This is the state of the platform.

                  Navigable prototype

                  Can be walked through in the demo

                  Simulated data. It helps evaluate experience, flow and model, not measure plant results.

                  • Live plant
                  • Operator console
                  • Digital preflight
                  • Execution and stoppages
                  • OEE
                  • Alerts and incidents
                  • Cost & Loss
                  • Energy and utilities
                  • Quality and traceability
                  • Weighing, bundles and labels
                  • Integration hub
                  • Edge connectivity
                  • Studio
                  • System health
                  Defined architecture

                  Requirements and design ready to build

                  Availability, scope and validation are confirmed in each project's technical assessment.

                  • Production-grade Kinetra Edge
                  • OT connectors: OPC UA, MQTT, S7, EtherNet/IP, Modbus TCP
                  • ERP adapters: SAP S/4HANA, Dynamics 365, Oracle
                  • Store-and-forward
                  • Command Gateway
                  • Full genealogy
                  • Quality management and holds
                  • Versioned configuration
                  • Signed software supply chain
                  Roadmap

                  Planned evolution

                  Considered in the model so the architecture is not blocked. No committed date.

                  • Statistical process control (SPC)
                  • Edge high availability
                  • Finite capacity scheduling
                  • AI advisory copilot

                  Let's see your plant in Kinetra.

                  Tell us what you want to solve. We build a walkthrough around your case and tell you what is prototype, what is architecture and what needs a technical assessment.

                  • A walkthrough of connectivity, execution, costs or whatever matters most in your operation.
                  • Architecture questions about your ERP, your SCADA and your OT network.
                  • Scope of a per-plant discovery: assets, connectors and integrations.

                  What your team usually asks.

                  How real is the product today?
                  There is a navigable prototype with simulated data and a defined architecture. Availability by connector, ERP and version is confirmed during the technical assessment. In the demo we show you clearly what is what.
                  Does Kinetra replace our ERP?
                  No. Kinetra is designed as the industrial execution layer connected to business systems. The ERP remains the financial system of record.
                  Does it replace PLC, SCADA or HMI?
                  No. Those systems keep control and supervision of the physical process, including interlocks and safety systems.
                  Does it have to connect directly to every PLC?
                  No. The design prioritizes OPC UA, SCADA, historians and gateways that already exist. A direct controller connection is a later option in the order of preference.
                  Which protocols does it cover?
                  The architecture defines OPC UA, MQTT with Sparkplug B, Siemens S7, EtherNet/IP and Modbus TCP as strategic families. Actual availability by version is confirmed in the technical assessment.
                  Does it integrate with SAP or Dynamics 365?
                  The architecture includes adapters for SAP S/4HANA, Dynamics 365 and Oracle. The scope and validation of each integration are confirmed per project.
                  What happens if the network goes down?
                  Edge resilience and store-and-forward are core design goals: the plant keeps operating with synchronized context and confirmations queue up without duplicating. The exact capability depends on the implementation and its validation.
                  Can Kinetra control machines?
                  Connections are read-only by default. Any future command goes through policy, authorization and the Command Gateway, and the controller keeps final authority. Generalized remote control is not planned.
                  How much does it cost to implement?
                  It depends on the number of plants, assets, connectors and integrations. We define it after a per-plant discovery. Request a demo and we start there.
                  Book a demo